Cron Schedule Preview
Runs in your browserRead a five-field cron expression in plain language and see when it will run.
How to use
What each field means
Enter minute, hour, day of month, month, and day of week, separated by spaces. Each example shows one field. Fill in the other four as well.
| Field | Accepted values | Single-field example |
|---|---|---|
| 1 · Minute | 0–59 | 0,30 runs at minute 0 and 30 of every hour. |
| 2 · Hour | 0–23, using a 24-hour clock. | 9-17 matches every hour from 9 through 17, inclusive. |
| 3 · Day of month | 1–31, the day number within the month. | 1,15 matches the 1st and 15th of each month. With 31 as the day, the schedule skips months without a 31st. |
| 4 · Month | 1–12, or use English abbreviations from JAN through DEC. | JAN,MAR and 1,3 are equivalent and match January and March. |
| 5 · Day of week | 0 or 7 represents Sunday. 1–6 represent Monday through Saturday. You can also use SUN through SAT. | MON-FRI and 1-5 are equivalent and match Monday through Friday. |
Steps
- Enter a five-field expression. To match every value in a field, enter
*. - Under Time zone, choose the zone where the task runs. The preview defaults to your device's time zone. For a task that follows the server time zone, use the server's setting.
- Select Preview run times to see the description and the next 10 runs. Copy result includes both.
Example
In Asia/Shanghai time zone, enter this expression to run at 9 a.m. Monday through Friday.
0 9 * * MON-FRI
Tips
,lists multiple values,-selects a range, and/sets an interval. In the minute field,*/15matches 0, 15, 30, and 45, while5-35/10matches 5, 15, 25, and 35.- When both the day-of-month and day-of-week fields are restricted, either one can match. For example,
0 9 1 * MONruns at 9 a.m. on the first of each month or every Monday. To schedule by weekday alone, set the day-of-month field to*. - Each run time includes its GMT offset, for example
GMT+8. When migrating from a schedule with seconds or a year field, check the original scheduler's rules before converting to five fields.